Active Risk Manager Alternatives

Keith Ricketts-Clew-GRC

Keith Ricketts

November 2, 2026
Time to read: 12 minutes

Summarize this article with:

ClaudeChatGPTGoogle GeminiPerplexityGrok
3 jobs
What Riskonnect ARM is built to do, each with a different best alternative
6 questions
To put to every vendor on your shortlist, ARM included
2 tools
When you need schedule risk analysis and connected enterprise risk
Didn't have time to read - TL;DR
3 key takeaways
1

The right Active Risk Manager alternative depends on the job. ARM runs schedule and cost risk analysis, a project-to-enterprise risk register, and the controls and assurance around those risks. Choose for the job you actually use it for.

2

For schedule risk analysis, look at specialist tools first. Tools built around Primavera P6 and Microsoft Project compete on that ground. A connected risk and assurance platform will not replace them like for like.

3

For the register and assurance, test the connections. Ask every vendor to trace one project risk to the objective it threatens, the control that manages it, the evidence that the control works and the action taken when it does not.

The right alternative depends on which job you bought it to do, so this guide gives a verdict for each, including the job where Clew is not the answer.

Disclosure

Clew publishes this guide, and Clew is one of the options it discusses. Facts about Active Risk Manager come from Riskonnect's own published pages. Where Clew is not the right fit, we say so.

Most people searching for Active Risk Manager alternatives are not unhappy with their software. They are at a review point. A renewal date is on the calendar, the board wants evidence behind its controls declaration, or an on-premise installation is due to move to hosted software. Each moment raises the same question: is a Riskonnect Active Risk Manager alternative worth evaluating, and if so, which one?

Published lists of alternatives rarely settle it. They compare software by category, so a quantitative risk product ends up beside quality, inspection and work management tools, none of which runs a schedule risk analysis.

Active Risk Manager does three jobs. It runs schedule and cost risk analysis. It holds the project-to-enterprise risk register. It carries the controls and assurance work around those risks. The right alternative depends on which job you bought it to do, so this guide gives a verdict for each, including the job where Clew is not the answer.

What Is Active Risk Manager (ARM)?

Active Risk Manager (ARM) is project, programme and enterprise risk management software owned by Riskonnect. It combines a risk register that aggregates project risks into an enterprise view with bow-tie analysis, dashboards, and Monte Carlo cost and schedule analysis linked to Primavera P6 and Microsoft Project. Originally developed by Strategic Thought Group, it has been part of Riskonnect since 2022.

Between 2013 and 2022 it sat within Sword Group, under the names Sword ARM, Sword Active Risk and Sword GRC. Riskonnect offers ARM as secure cloud software or for on-premise installation. Most of its published customer stories come from complex programmes in defence, government and infrastructure, where project risk rolls up to an enterprise view. That breadth is why Active Risk Manager alternatives are hard to compare: the right one depends on which job you rely on.

Why Organisations Look for Active Risk Manager Alternatives

A review of Active Risk Manager rarely starts with a fault in the software. It starts with a date or a change in scope.

Renewal or re-tender.

A contract end date is approaching and procurement wants evidence the market was tested. For a UK public body this may be the end of a G-Cloud call-off, and buying risk software through G-Cloud is often the route for what comes next.

A move to SaaS.

An on-premise installation is due to move to hosted software, a natural moment to ask whether the platform should move too.

Scope drift.

ARM was bought for programme risk and now carries the enterprise register, controls assurance or, for companies applying the UK Corporate Governance Code, the evidence behind the board’s Provision 29 declaration on material controls.

A proposal on a different product.

A renewal or expansion proposal built on a different product from the one you run today deserves the scrutiny of a new purchase.

A lost administrator.

The person who configured the scoring schemes, hierarchy and reports has moved on, and nobody else fully understands the set-up.

None of these is a verdict on ARM. Each is a reason to check your current platform still matches the job. For the enterprise suites, see our comparison of ten integrated risk management platforms.

What Do You Actually Use ARM For?

Active Risk Manager is a broad product. Before you look at alternatives, name the part you depend on.

Schedule and cost risk analysis. Project controls teams import a schedule from Primavera P6 or Microsoft Project, attach risks and uncertainty to activities, and run Monte Carlo simulation to estimate confidence levels for completion dates and cost. It is quantitative work on a logically linked schedule, and it informs contingency on major programmes.

The project-to-enterprise risk register. Project and programme risks roll up into one register with consistent scoring, so leaders see exposure across the portfolio and the board report draws on the same records.

Controls and assurance. Control owners record what manages each risk and whether it works, using bow-tie analysis, key risk indicators and actions. This is the job that answers the board’s question about control effectiveness

Key distinction

Schedule risk versus enterprise risk. Schedule risk analysis asks when a programme will finish and what it will cost. Enterprise risk asks which objectives are exposed and whether the controls are working.

Now answer three questions yes or no.

Do you import schedules from Primavera P6 or Microsoft Project and run Monte Carlo against them?

Does your board report come from ARM’s aggregated register?

Do control owners record evidence of control effectiveness in ARM?

A yes to the first question alone points to a specialist tool. A yes to the second or third points to a connected risk and assurance platform. Yes to all three usually means two tools. If you are unsure the simulation earns its keep, read where Monte Carlo simulation earns its place.

Active Risk Manager Alternatives Compared by Use Case

Use the table to compare project and enterprise risk management software job by job, with Active Risk Manager as one of the options. Read across the row for the job you named above.

JobWhat to look forExamplesWhere Clew fits
Schedule and cost risk analysisMonte Carlo run against a logically linked schedule imported from Primavera P6 or Microsoft Project, with risk-adjusted schedules exported backSpecialist tools such as Deltek AcumenNot a like-for-like replacement. Clew runs Monte Carlo on risk register exposures.
The project-to-enterprise risk registerMulti-entity aggregation, consistent scoring, filters and board-ready reportingConnected risk and assurance platforms and enterprise GRC suitesA credible alternative: a centralised register with multi-entity aggregation and real-time reporting across teams, projects and divisions
Controls and assuranceControls linked to risks and objectives, effectiveness evidence, bow-tie analysis, KRIs, incidents and actionsConnected risk and assurance platforms and enterprise GRC suitesA credible alternative, and broader: compliance, audit, safety and business continuity on the same records
Hosting constraintCustomer-hosted deployment where it is mandatoryARM offers on-premise as well as cloudNot Clew. Clew is SaaS only, hosted in the AWS region you choose, including UK and Australian regions

Aggregator lists look different because they group software by category rather than by job, which is how quality, inspection and work management tools end up beside a quantitative risk product. Every Active Risk Manager alternative in the table is strong somewhere, which is why the row you read matters more than the brand.

The first row is the one to get right. Schedule risk analysis software has to run Monte Carlo against a logically linked schedule, not against a list of risks with cost ranges attached. Specialist tools built around Primavera P6 and Microsoft Project do this and export risk-adjusted schedules back to the planning tool. So does ARM, which is a good reason to keep it for this job if it is working.

The second and third rows are different work. They ask whether the register is consistent across entities, and whether controls are evidenced and linked to the objectives they protect. The real differences between platforms show up when those links meet a reorganisation, a new project or a failed control. Ask for a demonstration with your own hierarchy, because sample data always aggregates neatly.

The hosting row is a constraint, not a job. If customer-hosted deployment is mandatory, it narrows the field before anything else.

"The question is not which product replaces ARM. It is which job you bought ARM to do."

When Clew Is the Right Riskonnect Active Risk Manager Alternative

Once Active Risk Manager has become the enterprise register, the hard question changes. It is no longer how to score a risk. It is whether you can show which objective a failing control protects, what the evidence says and what was done about it. A schedule risk tool does not answer that question, and a programme risk register was not designed to.

Clew is built to keep that chain connected, from objective to risk to control to evidence to action. Our purpose-built risk management software gives you a centralised register with multi-entity aggregation and real-time reporting across teams, projects and divisions, and key risk indicators linked to business objectives.

Take a rail upgrade programme with a risk that a long-lead signalling component arrives late. The project team owns that risk in its project register, and it links into the enterprise register against the objective of delivering the capital plan. The control is a contracted delivery milestone backed by monthly supplier assurance. When assurance shows two missed checkpoints, the control is recorded as ineffective and an action is raised with an owner and a due date. The enterprise view shows the exposed objective as soon as the record changes.

The same records carry bow-tie analysis, control testing across the three lines model, incidents and actions, alongside compliance, audit, safety and business continuity modules. Clew AI Chat helps users explore them, with professional judgement remaining with the user.

For project risk, Clew holds project-level risk registers, and project risks link into the enterprise register rather than being copied into it.

Clew’s published reach is more than 1 million users in more than 70 countries, over more than 15 years. Customers include Glencore, IGO, GHD, the UK Atomic Energy Authority and Western Australian government departments. Glencore’s Head of Compliance Monitoring and Risk credits Clew with improving consistency, workflow management and visibility across a global compliance risk assessment process. The IGO mining case study shows a live, organisation-wide view of critical control performance. UK public sector buyers can use Clew’s G-Cloud 15 listing.

Be clear about the limits. Clew is SaaS only, hosted in the AWS region you select, including UK and Australian regions.

When to Keep ARM, or Pair It With a Specialist Tool

There is a clear case for keeping Active Risk Manager when on-premise hosting is mandatory. ARM offers it. Clew does not.

Where an organisation needs both schedule risk analysis and connected enterprise risk, the realistic answer is two tools with a clear boundary. A specialist tool runs schedule risk analysis on the major programmes, close to the planners and the schedule. Clew holds the enterprise view, the controls and the assurance evidence. Project risks that matter beyond the project link into the enterprise register rather than being copied, so each risk has one record and one owner.

"A comparison is only useful if it tells you when not to switch."

Write the boundary down. Agree which risks live where, who owns each link, and which system the board report comes from. Without that agreement, two tools quietly become two registers.

How to Migrate From Active Risk Manager Without Losing History

Migration starts with an inventory of what is live, not everything that is stored. List open risks, controls and actions, scoring schemes, hierarchy, custom fields and the reports people actually use.

Then confirm how the data leaves. Riskonnect’s G-Cloud 15 listing for Active Risk Manager states that at contract end a database back-up will be provided on request, or customers can export data using the software’s own tools or the REST API, in formats including CSV, PDF, RTF, PPT and JSON. Confirm the method, format and timing in writing well before the contract end date, so the export is not negotiated against the clock.

Map scoring schemes and hierarchy before you move a single record. If divisions score on different matrices, decide whether to harmonise or preserve them, and how historic scores will read in the new scheme.

Key distinction

Migrate versus archive. Move live risks, controls and actions. Archive closed history in a format you can still search, rather than carrying it into the new system.

There is precedent for moving less, not more. When IGO moved off spreadsheets, its team rebuilt its registers in workshops rather than importing them, and the case study credits that choice with a significant improvement in data quality.

Run one full reporting cycle in parallel. Produce the board report from both systems and reconcile every difference, because each one is either a mapping error or a decision nobody recorded.

Re-baseline key risk indicators after cut-over. Thresholds set against old data or an old scoring scheme can fire, or stay silent, for reasons unrelated to the risk.

For the decisions in more depth, read our guide to planning a risk platform change with confidence. Whichever Active Risk Manager alternative you choose, treat any quoted timeline as a set of assumptions to test.

Six Questions to Ask Any Active Risk Manager Alternative

Put the same six questions to every vendor on your shortlist, including Riskonnect for Active Risk Manager. Each one tests one of the three jobs, or the move between systems.

Can you trace one of our project risks to the objective, control, evidence and action, using our data?

Do you run Monte Carlo against an imported P6 or Microsoft Project schedule, or against register exposures, and can we see the output?

How will you import our ARM scoring schemes, hierarchy and history, and what do you recommend we archive?

Where will our data be hosted, and can we choose the region?

How does licensing change as more control owners and project teams take part?

Which product, release and modules is your proposal built on?

The first question tests controls and assurance, the second tests schedule and cost risk analysis, and the fifth tests whether the project-to-enterprise risk register can grow without penalising participation. The others protect the move. A vendor that cannot answer the sixth in writing has not finished scoping the proposal.

Score what you see, not what you are told. Ask for each demonstration in your own terminology and, where possible, on your own data. For a fuller procurement framework, use a structured buyer’s guide for risk software.

Frequently asked questions about Riskonnect ARM alternatives

The best Active Risk Manager alternative depends on the job ARM does for you. For schedule and cost risk analysis, look at specialist tools built around Primavera P6 and Microsoft Project, such as Deltek Acumen. For the register and assurance, look at connected risk and assurance platforms such as Clew. Where both jobs matter, use two tools with a clear boundary.

Active Risk Manager (ARM) is used for project, programme and enterprise risk management. It runs Monte Carlo cost and schedule risk analysis linked to Primavera P6 and Microsoft Project, aggregates project risks into an enterprise register, and supports bow-tie analysis, heat maps and dashboards with key risk indicators. Riskonnect lists frameworks including ISO 31000, COSO and PMBOK.

Yes. Riskonnect’s G-Cloud 15 listing for Active Risk Manager states that a database back-up will be provided on request at contract end, or data can be exported through the software’s own tools or the REST API, in formats including CSV, PDF, RTF, PPT and JSON. Confirm the method and timing in writing before your contract ends.

Clew is an Active Risk Manager alternative for two of its three jobs: the project-to-enterprise risk register, and controls and assurance, where Clew links each risk to its objective, controls, evidence and actions. For schedule and cost risk analysis it is not like for like, because Clew runs Monte Carlo on register exposures rather than an imported schedule. Clew is SaaS only, while ARM also offers on-premise hosting.

Project risk software helps a team deliver on time and on budget, often with schedule and cost risk analysis against the plan. Enterprise risk software shows which objectives are exposed and whether the controls protecting them work. Some products, including Active Risk Manager and Clew, connect the two by bringing project risks into an enterprise register.

Choose Your Active Risk Manager Alternative by the Job

Which job did you buy Active Risk Manager to do? If it was schedule and cost risk analysis, and that work is going well, keep it or shortlist the specialist tools. If it was the project-to-enterprise risk register, or controls and assurance, ask whether your platform can trace each risk from objective to control to evidence to action, and keep that line intact through change.

That line has a name at Clew: the Golden Thread, explained in full in our white paper. It runs from strategic objectives, through material risks and the critical controls that manage them, to the assurance evidence that validates those controls and the actions taken when weaknesses are found.

If that is what you need, book a demo built around your current ARM set-up or see how Clew connects project and enterprise risk. Not ready for a demo? Start with our white paper on changing risk platforms with confidence. Either way, answer the question about the job first. Everything else follows from it.

Sources and Product Information

Facts about Active Risk Manager were taken from the sources below. Confirm current releases, modules and hosting options against any written proposal.

Clew-Logo

Clew is a risk and assurance platform built around the Golden Thread, the traceable link from strategic objectives to the controls that manage them and the exposure that remains.

Explore Clew's risk management software →
Keith Ricketts-Clew Risk Software

Meet the author

Keith Ricketts

VP Of Marketing

25 years with global software vendors in Cyber Security, Risk and ERP. Blends strategic marketing, agility and a proven record of results.